video

525-565 Conestogo

project 525-565 Conestogo LOCATION   Waterloo, ON  PROJECT TYPE   Master Planning, Mixed-Use COMPLETION DATE   Ongoing Situated along the Conestogo Parkway in North Waterloo, the development proposal reimagines a former flooring manufacturing facility as a vibrant, mixed-use neighbourhood. This 8-phase development unites a thoughtful distribution of mixed-use blocks which include 15 buildings ranging from 3-35 storeys in …

525-565 Conestogo VIEW FULL ARTICLE

ABA Research Collective

project The Research Collective THEORETICAL RESEARCH PROJECT TYPE   Residential, Interiors, Mixed-Use COMPLETION DATE  2020 https://abarchitect.ca/wp-content/uploads/2021/05/2020.11.25-ABA-Research-Collective-Video-Compressed.mp4 VIEW ALL PROJECTS

144 Watson

project 144 Watson LOCATION   Guelph, ON PROJECT TYPE   Residential, Interiors COMPLETION DATE  2020 144 Watson is a 7-storey apartment building constructed of loadbearing masonry, precast floors, with brick and stone cladding. The project features an enhanced streetscape as well as a naturalized landscape that is connected to an onsite infiltration gallery. In addition to the …

144 Watson VIEW FULL ARTICLE

Garment Street Condos

project Garment Street Condos LOCATION  Kitchener, ON PROJECT TYPE   Mixed-Use, Master Planning COMPLETION DATE  Ongoing Garment Street Condos is a three-tower residential development in Downtown Kitchener. The development features an internal road named “Garment Street,” as a tribute to the traditions of industry on the site. The concept pulls together the residential development and a …

Garment Street Condos VIEW FULL ARTICLE